Jawahar Navodaya Vidyalaya Hadagarh,Keonjhar,Orissa
 
 
 
 
 
Running JNVs:    J.N.V. Keonjhar      J.N.V. Jagatsingpur,      J.N.V. Jajpur,      J.N.V. Cuttack,      J.N.V. Kendrapada,      J.N.V. Mayurbhanj,      J.N.V. Balasore,      J.N.V. Bhadrak,      J.N.V. Dhenkanal,      J.N.V. Angul
About Us
Aims & Objectives
Management Commitee
History
Infrastructure
Future Plans
Organisational Structure
Directory Contact
Photo Gallery
 
 
INFRASTRUCTURE
 

Jawahar Navodaya Vidyalaya, Keonjhar is situated at Hadagarh(adjacent to Elephant Sanctuary) at a distance of 110 Kms from the Distt. HQ and just 52 kms away from the Bhadrak(Charampa) Railway station (Howrah-Chennai route )& 180 kms. From Bhubaneswar Airport. Only Auto service is available from chenapadi (16 kms.from the JNV),the nearest busstop on Bhadrak-Anandapur State Highway . Being residential by establishment, It is set up in an area more than 30 acres with Admn. Building, Hostel for Boys and Girls, Staff Residence, Mess, Well equipped Computer, Physics, Chemistry, Biology & Geography labs, MP Hall with 500 capacity, Library, and   with rural feeded electricity & water Supply through a overhead tank with 50000 lt Capacity

School Building:
The School shifted to the permanent building (CBRI Model) in the year 1997 - 98. It plays the important role of carrying out all the administrative & academic activities and smooth functioning of the School. School building consists of Principal Room, Office, Staff Room, Store Room etc. It caters to the needs of the students, staff members and the employees; purchases and keeps a check on the utilization of stock to ensure that there are no shortfalls of necessary materials, and that maintenance works are well taken care of at all times.
Multipurpose Hall:
At the multipurpose hall, workshops, meetings and group discussions, morning and evening assembly,CCA ,Pace setting and seminars are conducted in a large and open space, and up to 500 people can be gathered in the multipurpose at a time
Proposed infrastructure:

The following infrastructure has been proposed and approval of which is awaited .

Additional Dormitory

Boys-48 strength
Girls-48 strength
Boundary wall
5 Type-III Quarters
Gen-Set room
Play Ground
Land Scalping & Path ways
Storm water Drain
 

I

Area of land allotted (in acres)

Whether land transferred in the Name of Samiti

Vidyalaya shifted to permanent buildings on

: 20Acres

: Under Process

: in 1993

-

ii

Status of Boundary Wall
a. Brick Wall
b. Barbed wire fencing

: (Incomplete)

-

iii

Permanent buildings constructed

: (CBRI pattern/ CPWD pattern) Both CBRI & CPWD
-

iv

School building

: Complete

-

v

Dormitories

: Boys- 04 Nos. with Warden Residence 02 Nos.

-

: Girls 04 Nos. with Warden Residence 02 Nos.

-

vi

Kitchen/Dining Hall

No. of shifts required for all students to take food

: Complete, Area 160ft*80ft

: 02 Shifts

-

vii

Principal Residence

: 01 No.

-

viii

Staff Quarters

 

: Type III = 12 Nos.
Type II = 24 Nos.
Type I = 01 Nos.
SP Sheds converted into Staff Qrs.:_____ Nos.

-

ix

M.P. Hall

: Available

x

Workshop

: Available

xi

Type of O.H. Tank

Its capacity

Present Status

: Column based

: 50000 litres

: Working satisfactory

xii

U.G. tank

Its capacity

Present Status

: 50000 litres

: Working satisfactory

xiii

D.G. Set

 

: Available
: _____________ make
: 2 KVA-01 No.
2.8 KVA-01 No
: Working
: Year of procurement- 2004 & 2006

xiv

Sewage Pump

: 7.5 H.P.(02 Nos) 01 is working

xv

Water Pump

5 H.P(02 Nos),3 H.P(01 No), 1 HP(jet Pump)-3 Nos

xvi

Electrification

Electric connection

Sub Station building

Street lighting

Numbers of hrs. during day when power supply is available on an average.

: Rural Feeder

: Complete

: 12 Nos. of Poles

: 8 hrs.(during day)

: 10 hrs.(during night)

xvii

Playfields

400 metre track

40 x 30 metre basket ball court

40 x 30 metre volley ball court

: Not available

: 02 Nos. – Available

: ____Nos. Not available

xviii

Water supply

Tube Well

Hand pump

Connection from PHED

: Potable, 03 Nos.- working-02 / not working-01

: Potable, 01 Nos.- working

: ______ hours supply in a day

xix

Rajiv Gandhi Smriti Van

: Not available

xx

Fire fighting arrangement

: Working

xxi

Last date of cleaning of

  • Septic tank
  • Water tanks

: May 2007
: May 2007

xxii

Whether area around transformer is fenced

: Yes

xxiii

Whether open wells, if any, are covered from top

: 01 Covered, 01-Not covered

xxiv

Works taken up under M&R fund during current year and last year:-

: 1. Construction of in built dining table
2. White washing, colour and painting of staff quarters, dormitories, academic block,
3. In built table in computer lab.

Year

Name of work (M&R)

Expenditure (Rs. In lacs)

Cumulative expenditure during the year

2007-08

-

4.5 lacs

-
 
Jawahar Navodaya Vidyalaya Hadagarh,Keonjhar,Orissa
Home   About JNV   Academic Programme   Faculty   Results   Students  Alumni  Contact Us  
  © 2006,. All rights reserved.   Site Designed & Powered by :    IS&T